Kuhbett wind met mast

Project description

The wind met mast recorded the wind speed inside the planned Kuhbett wind park for 12 months. The results, or more precisely information about the wind speed and distribution, will help us to plan the wind farm with an optimum design.


Technical data

Measuring mast height: 141,5 m

Location height: 634 m above sea level

Measuring heights: 60m, 80m, 105m, 130m, 139m, 141m

Measuring equipment:
6 x cup anemometer
3 x wind vane
2 x temperature
1 x air humidity


planning

construction

commissioning

2015

2015

August 2015


Operator

Dunoair Windpark Planung GmbH


Location

Hessen, Limburg-Weilburg County, City of Bad Camberg

Contact

DunoAir Windpark Planung GmbH
Brotstraße 1
D-54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstr. 13
D-46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek / NL
Netherlands
Tel  +31 (0)26 33 44 240
Fax +31 (0)26 33 44 249