Mastershausen II wind farm
(2010)

The success of Mastershausen I and the mutual trust between the community and DunoAir led to the commissioning of three further wind turbines in the summer of 2010. In the farm’s second expansion stage, three wind turbines with a hub height of 98 m to 108 m were commissioned in addition to the existing seven wind turbines already operating. Expansion of the wind farm will supply an extra 15 million kilowatt hours of electricity.

This will increase the total annual electricity production of the Mastershausen wind farm (I and II) to 42 million kWh.


Current operating results

You can check the output and availability of the Kappel wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2009

2010

Summer 2010


Operator

Masterhausen II GmbH & Co. KG


Location

Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Kastellaun, Mastershausen


Turbines

E-82 E2 (2.3 MW)


Environmental balance

Estimated yield

15.5 Mio. kWh

Co2-savings

8,200 metric tons

So2-savings

8 metric tons

Electricity for

4,000 3-persons households

Contact

DunoAir Windpark Planung GmbH
Brotstraße 1
D-54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstr. 13
D-46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek / NL
Netherlands
Tel  +31 (0)26 33 44 240
Fax +31 (0)26 33 44 249