Nienhagen wind farm (2008)

In February 2008, work started on the construction of four Enercon E-70 wind turbines with a hub height of 98 m. The farm was connected to the public grid in October 2008. With the expected annual production of 15 million kilowatt hours, the farm can supply electricity to around 4,000 households. The four wind turbines save 8,200 tonnes of CO2 and five tonnes of sulphur dioxide a year.


Current operating results

You can check the output and availability of the Kappel wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2009

Spring 2008

Autumn 2008


Operator

Windpark Nienhagen GmbH & Co. KG


Location

North Rhine-Westphalia, Lippe County, Detmold


Turbines

E-70 (2.0 MW)


Environmental balance

Estimated yield

15.5 Mio. kWh

Co2-savings

8,200 metric tons

So2-savings

5 metric tons

Electricity for

4,000 3-persons households

Contact

DunoAir Windpark Planung GmbH
Brotstraße 1
D-54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstr. 13
D-46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek / NL
Netherlands
Tel  +31 (0)26 33 44 240
Fax +31 (0)26 33 44 249