In February 2008, construction began on five Enercon wind turbines. The turbines are an example of how well, with optimum planning, wind turbines can be integrated into the cultural landscape. The five wind turbines with a hub height of up to 108 m are located on agricultural land where arable farming is continued without major restrictions or loss of land.

The Springe-Bennigsen wind farm will produce around 23 million kilowatt hours of clean electricity a year, saving 12,100 tonnes of CO2 and 12 tonnes of sulphur dioxide.

The farm was connected to the grid in January 2009.


You can check the output and availability of the Kappel wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2007

Spring 2008

January 2009


Operator

Windpark Springe-Bennigsen GmbH & Co. KG


Location

Lower Saxony, Greater Hannover, Springe and Bennigsen


Turbines

E-82 (2.0 MW)


Environmental balance

Estimated yield

23 Mio. kWh

Co2-savings

12,100 metric tons

So2-savings

12  metric tons

Electricity for

6,000 3-persons households

Contact

DunoAir Windpark Planung GmbH
Brotstraße 1
D-54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstr. 13
D-46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek / NL
Netherlands
Tel  +31 (0)26 33 44 240
Fax +31 (0)26 33 44 249