The rotors in the Kappel wind farm have been turning since the end of August/beginning of September 2013. Consisting of seven wind turbines, the project is part of the largest wind farm in southwest Germany. Following successful completion of the construction work, 3 Enercon E-70 and 4 Enercon E-82 wind turbines, each with a rated power of 2.3 MW, were commissioned.

The electricity produced is fed into DunoAir’s own substation in Mastershausen.


Currrent operating results

You can check the output and availability of the Kappel wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2010

2012

summer 2013


Operator

DunoAir Windpark Kappel GmbH & Co. KG


Location

Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Kastellaun, Kappel


Anlagen

E-70 E4 (2,3 MW)

E-82 E2 (2,3 MW)


Estimated yield

28,36 Mio. kWh

Co2-savings

14.900 metric tons

So2-savings

14,5 metric tons

Electricity for

7.300 3-persons households

Contact

DunoAir Windpark Planung GmbH
Brotstraße 1
D-54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstr. 13
D-46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek / NL
Netherlands
Tel  +31 (0)26 33 44 240
Fax +31 (0)26 33 44 249