Bous Wind Farm (2018)

Bous Wind Farm

As the second Saarland project, three wind turbines of the type E-115 with a total output of 9.0 MW were planned and built in the municipality of Bous on forest areas of the SaarForst.

In July 2016, the permit application was submitted according to the Federal Immission Control Act. We received the approval notification in the fourth quarter of 2016.

After the grubbing for the construction of the infrastructure was started early in 2017, the further construction had to pause for a year and a half. During this time, a statement of the UNESCO for dealing with the World Heritage Site "Völklinger Hütte" was expected. But after the agreement with the Ministry, the construction of the three facilities could be continued at the risk of DunoAir in the early summer of 2018.

The plants were built in close cooperation with all institutions involved, so that the first plant could already be put into operation in autumn.

The generated electricity is fed into the grind via the nearby substation.


Current operating results

You can check the output and availability of the Schwalbach wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


Planning

Construction

Commissioning

2015

2018

2018


Operator

Windpark Bous GmbH & Co. KG


Location

Saarland, Saarlouis County, Bous


Turbines

E-115 (3.0 MW)


Environmental Balance

Estimated yield

21.5 Mio. kWh

Co2-savings

11.900 metric tons

So2-savings

11.600 metric tons

Electricity for

5.500 3-persons-households

Contact

DunoAir Windpark Planung GmbH
Hawstraße 2a
54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstraße 13
46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek
Netherlands
Tel  +31 (0)26 - 33 44 2 - 40
Fax +31 (0)26 - 33 44 2 - 49