Kuhbett Windfarm (2018)

Kuhbett Windfarm

In the Kuhbett wind farm, four E-115 with a total output of 12.0 MW have been constructed on forested areas of the city of Bad Camberg and the Hessian Forestry. Private owners are not involved.

The area of the wind farm is one of the windiest areas in the entire region. However, in order to be able to correctly estimate the wind speeds at the location, DunoAir had therefore measured the conditions at 6 heights starting from August 2015 over a period of one year with a 140 m high measuring mast. The results then went directly into the planning.

In February 2016, DunoAir submitted the permit application according to the Federal Immission Control Act and received the notification at the end of December 2016. The wind farm was built mainly over the year 2017, so that the first wind turbines went into operation at the beginning of 2018.

The Kuhbett wind farm is connected to the public electricity grid via the Niederselters substation. Thus, about 7,300 average housholds can be supplied.



Planning

Construction

Commissioning

2015

2017/2018

Early 2018


Operator

Windpark Kuhbett GmbH & Co. KG


Location

Hessen, Limburg-Weilburg County, City of Bad Camberg


Turbines

E-115 (3.0 MW)


Environmental balance

Estimated yield

28.3 Mio. kWh

Co2-savings

17,500 metric tons

So2-savings

16,400 metric tons

Electricity for

7,300 3-persons-households

Contact

DunoAir Windpark Planung GmbH
Hawstraße 2a
54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstraße 13
46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek
Netherlands
Tel  +31 (0)26 - 33 44 2 - 40
Fax +31 (0)26 - 33 44 2 - 49