Weibern-Rieden wind farm
(2011)

Weibern-Rieden Wind farm

The Weibern-Rieden wind farm is divided between two local communities. As a result, planning and consent were comparatively costly and time-consuming but it was nevertheless completed successfully in 2011. The first four wind turbines were connected to the grid in the summer of 2011 with the last two turbines following in the spring of 2012. The Weibern-Rieden wind farm is expected to produce 22.7 million kWh of electricity a year which means a saving of 11,900 tonnes of CO2 and 11.6 tonnes of sulphur dioxide.


Current operating results

You can check the output and availability of the Weibern & Rieden wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2010

2011

Summer 2011


Operator

Windpark Weibern GmbH & Co. KG

Windpark Rieden GmbH & Co. KG


Location

Rhineland-Palatinate, Ahrweiler and Mayen County, Weibern and Rieden


Turbines

E-82 EP2 (2 MW)


E-70 E4 (2.3 MW)


Environmental balance

Estimated yield

22.7 Mio. kWh

Co2-savings

11,900 metric tons

So2-savings

12 metric tons

Electricity for

5,900 3-persons households

Contact

DunoAir Windpark Planung GmbH
Hawstraße 2a
54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstraße 13
46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek
Netherlands
Tel  +31 (0)26 - 33 44 2 - 40
Fax +31 (0)26 - 33 44 2 - 49