Krastel-Leideneck wind farm (2014)

Krastel-Leideneck wind farm

Since 2.9.2014, the first rotor in the Krastel-Leideneck wind farm has been turning. Then, at the beginning and end of October, the second and third turbines were added. The fourth turbine was connected to the grid on 31.10.2014.

Since then, our first wind farm with Enercon E-101 turbines was installed.

The electricity produced is fed into DunoAir’s own substation in Mastershausen.


Current operating results

You can check the output and availability of the Krastel-Leideneck wind farm here at any time. The operating data and availability of the wind turbines are provided in daily, monthly and annual overviews.


planning

construction

commissioning

2010

2013

autumn 2014


Operator

1. - 4. Windpark Krastel GmbH & Co. KG


Rhineland-Palatinate, Rhein-Hunsrück-Kreis, Katellaun, Bell


Anlagen

E-101 / 135 m (3.05 MW)


Environmental Balance

Estimated yield

26.57 Mio. kWh

Co2-savings

13.97 metric tons

So2-savings

13.57 metric tons

Electricity for

6,850 3-persons households

Contact

DunoAir Windpark Planung GmbH
Hawstraße 2a
54290 Trier
Germany
Tel  +49 (0)651 – 99 98 89 - 0
Fax +49 (0)651 – 99 98 89 - 99
trier@dunoair.com

DunoAir Windverwaltung GmbH
Wertherbrucherstraße 13
46459 Rees
Germany

DunoAir
Stationsweg 2
6861 EG, Oosterbeek
Netherlands
Tel  +31 (0)26 - 33 44 2 - 40
Fax +31 (0)26 - 33 44 2 - 49